Errata for MCTS Self-Paced Training Kit (Exam 70-632): Managing Projects with Microsoft® Office Project 2007
Submit your own errata for this product.
The errata list is a list of errors and their corrections that were found after the product was released. If the error was corrected in a later version or reprint the date of the correction will be displayed in the column titled "Date Corrected".
The following errata were submitted by our customers and approved as valid errors by the author or editor.
Color Key: Serious Technical Mistake Minor Technical Mistake Language or formatting error Typo Question Note Update
| Version |
Location |
Description |
Submitted By |
Date Submitted |
Date Corrected |
| Printed |
Page xx
|
Digital Content link incorrect
On page xx, in the box under the 2nd bullet point in "Using the CD" the link provided for Digital Content for Digital Book Readers is incorrect.
Change:
http://go.microsoft.com/fwlink/?/LinkId=116279To:
http://go.microsoft.com/fwlink/?LinkID=116279
|
Microsoft Press |
May 06, 2010 |
|
| Printed |
Page 50
|
Table 1-1 missing duration code
On page 50, Table 1-1 is missing a duration code for "Months."
Change:
"Mo, Month"
To:
"Mo, Mon, Month"
|
Microsoft Press |
Jul 13, 2010 |
|
| Printed |
Page 82
|
"task" should be "project"
On page 82, answer B to question 3 uses an incorrect term regarding a project.
Change:
"B. Copy the Night Shift calendar in the Change Working Time dialog box and apply this calendar to the Taking Inventory task."
To:
"B. Copy the Night Shift calendar in the Change Working Time dialog box and apply this calendar to the Taking Inventory project."
|
Microsoft Press |
May 06, 2010 |
|
| Printed |
Page 170
|
"48" should be "192"
On page 170, Answer B for Question 3 is incorrect.
Change:
"B. 48 hours"
To:
"B. 192 hours"
|
Microsoft Press |
Jul 13, 2010 |
|
| Printed |
Page 201
|
10,000 should be 1,000
On page 201, the second sentence of step 18 is incorrect.
Change:
"Project changes the value to 40 Square Yards and the Cost to $10,000 (40 square yards at $25 per square yard)."
To:
"Project changes the value to 40 Square Yards and the Cost to $1,000 (40 square yards at $25 per square yard)."
|
Microsoft Press |
May 06, 2010 |
|
| Printed |
Page 203
|
"Resource Management" should be "Formatting"
On page 203, step 2 of Exercise 7 refers to the wrong toolbar.
Change:
"Choose All Resources on the Resource Management toolbar and scroll to the bottom of the drop-down list."
To:
"Choose All Resources on the Formatting toolbar and scroll to the bottom of the drop-down list."
|
Microsoft Press |
Jul 13, 2010 |
|
| Printed |
Page 367
|
"Choose two" should be "Choose three"
On page 367, the instructions for Question 7 which state how many answers you should choose is incorrect.
Change:
"(Choose two. Each represents part of the answer.)"
To:
"(Choose three. Each represents part of the answer.)"
|
Microsoft Press |
May 06, 2010 |
|
| Printed |
Page 450
|
Instructions in Step 3 are incorrect
On page 450, the instructions in Step 3 is incorrect for this specific practice.
Change:
"3. To create a task report, click New in the Custom Reports dialog box, select Task, and then click OK."
To:
"3. To edit a task report, select Completed Tasks in the Custom Reports dialog box and then click Edit."
|
Microsoft Press |
Jul 13, 2010 |
|
| Printed |
Page 475
|
Answer A is not a correct answer
On page 475, Answer A of Quesiton 3 is incorrectly marked as correct.
Change:
"A. Correct: Edit and Indent is a valid option for indenting a task to make it a subtask."
To:
"A. Incorrect: The Indent option is not available in the Edit menu."
|
Microsoft Press |
May 06, 2010 |
|
| Printed |
Page 478
|
Answer B explanation is incorrect
On page 478, the explanation for Question 3 Answer B is incorrect.
Change:
"B. Correct: Using the formula Work = Duration/Units and knowing that the duration is 4 days on a 24-hour schedule and that units = 200% (four machines at 50% capacity), the formula reads W=4/200%=4/2=2. 2 days is 48 hours on a 24-hour
calendar."
To:
"B. Correct: Using the formula Work = Duration*Units and knowing that the duration is 4 days on a 24-hour schedule and that units = 200% (four machines at 50% capacity), the formula reads W=4*200%=4*2=8. 8 days is 192 hours on a 24-hour calendar."
|
Microsoft Press |
Jul 13, 2010 |
|
| Printed |
Page 492
|
Answer explanation for B is incorrect
On page 492, the answer explanation for Question 6, Answer B is incorrect.
Change:
"B. Incorrect: Front loaded increases the hours scheduled per day from the start to the end of the task."
To:
"B. Incorrect: Front loaded assigns fewer hours each day from the Start to the Finish of the task."
Microsoft Press is committed to providing informative and accurate
books. All comments and corrections listed above are ready for
inclusion in future printings of this book. If you have a later printing
of this book, it may already contain most or all of the above corrections.
|
Microsoft Press |
May 06, 2010 |
|
|
| |