Cwmbach

Post-1919

TSB-10

Internal floor area: 74 m2

Primary energy

pre-retrofit calculated: 678 kWh/m2/yr

post-retrofit measured: 218 kWh/m2/yr

  • Client: RCT Homes
  • Architect: BRE (Andrew sutton)
  • Contractor: Jistcourt (south Wales) Ltd
  • Consultants: Melin Energy, Lee Wakemans Ltd (costs)
fig0133

Front façade post-retrofit