Chapter 11. Well Test Analysis: Straightline Methods
11.1 Introduction
Well testing by activation of pressure transients in the wellbore is routinely conducted to collect data which can be analyzed for well and reservoir properties. During drilling operations, well testing is conducted with drillstem tests (DST) or with openhole formation tester tools. For producing wells, testing is typically performed with either flow (drawdown) or shut-in (buildup) tests depending on well conditions, and reservoir properties to be calculated from the test data. For injection wells, test data can be obtained by changing injection rates (injection tests) or by shutting-down injection (falloff tests). Well test data are analyzed with methods that have been ...
Get Petroleum Reservoir Engineering Practice now with the O’Reilly learning platform.
O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.