Errata

Predictive Analytics for the Modern Enterprise

Errata for Predictive Analytics for the Modern Enterprise

Submit your own errata for this product.

The errata list is a list of errors and their corrections that were found after the product was released. If the error was corrected in a later version or reprint the date of the correction will be displayed in the column titled "Date Corrected".

The following errata were submitted by our customers and approved as valid errors by the author or editor.

Color key: Serious technical mistake Minor technical mistake Language or formatting error Typo Question Note Update

Version Location Description Submitted By Date submitted Date corrected
Printed, PDF, ePub, Mobi, O'Reilly learning platform, Other Digital Version
Page 52
Line 1, Matrix 2 and Matrix 3 (3 errors)

Line 1 reads: Step 1: Multiply equation 1 by –1.5 and add it to equation 2. Multiply equation 1 by 6 and add it to equation 3.
Line 1 should read: Step 1: Multiply equation 1 by –1.5 and add it to equation 2. Multiply equation 1 by 3 and add it to equation 3.

Matrix 2 row 3 reads [0 1 16 -126]
Matrix 2 row 3 should read [0 16 -1 -126]

Matrix 3 row 3 reads [0 1 13/19 -26/19]
Matrix 3 row 3 should read [ 0 0 13/19 -26/19]

Nooruddin Abbas Ali  Sep 24, 2024  Sep 27, 2024