Errata
The errata list is a list of errors and their corrections that were found after the product was released. If the error was corrected in a later version or reprint the date of the correction will be displayed in the column titled "Date Corrected".
The following errata were submitted by our customers and approved as valid errors by the author or editor.
Color key: Serious technical mistake Minor technical mistake Language or formatting error Typo Question Note Update
Version | Location | Description | Submitted By | Date submitted | Date corrected |
---|---|---|---|---|---|
Printed | Page P143 Bottom |
In the magnets, the item "Contract" is missing, while the item "Project charter" is not used on the next page. Note from the Author or Editor: |
Luc Hamers | Feb 02, 2014 | Jul 14, 2014 |
Printed, PDF | Page P854 First item |
According to the index, the work authorization system is found on 5 different pages. Actually it only appear on page 115 and in some answers of exam questions (for example on page 153). So four of five page numbers in the index are wrong. Note from the Author or Editor: |
Luc Hamers | Feb 02, 2014 | Jul 14, 2014 |
Printed, PDF | Page P277 Right vertical |
The answers for the exercise are found on page 324, not on 318 as stated. Note from the Author or Editor: |
Luc Hamers | Feb 12, 2014 | Jul 14, 2014 |
Printed |
United States |
i am nearly completing to read chapter#14 on professional responsibility. on page 701 bottom, it says to go read PMP code of professional conduct before you take exam. go to URL http://ww.headfirstlabs.com/hfpmp and click on link "The PMI Code of Ethics.." link. BUT i could not find the link or words "PMI code of ethics... on page to click link on? what am i missing to view? same is on PDF. Note from the Author or Editor: |
aditya | Dec 26, 2014 | Feb 19, 2016 |
Printed |
Upper left quadrant |
Question 9. refers to "Run Charts" as being one of the Seven basic tools of quality. However on pages 425-427 where these seven tools are described, there is 1) no mention of run charts, 2) already seven basic tools mentioned which are not run charts (making 8). Note from the Author or Editor: |
Greg EVA | Aug 13, 2015 | Feb 19, 2016 |
Printed | Page copyright |
Add credit to copyright page: |
O'Reilly Media |
Apr 10, 2018 | |
Printed | Page 111 Bottom line |
Answers are not on page 108. Answers are on page 114. Note from the Author or Editor: |
Anonymous | Jan 26, 2014 | Jan 31, 2014 |
Printed | Page 133 Right edge of page |
"Organizational process assets" is mis-typed as "Organizational process ssets." It appears in only one place on this page, toward the middle of the page on the far right edge. Note from the Author or Editor: |
William Clements | Nov 28, 2014 | Feb 19, 2016 |
Page 140 1st paragraph |
The inputs of close project or phase does not include EEF, deliverables, contracts Or work performance information but still that paragraph mentions them as the inputs for close project process. Note from the Author or Editor: |
Manish Agarwal | Jan 15, 2014 | Jan 31, 2014 | |
Printed | Page 141 Outputs |
In the outputs section, "organizational process assets" should be "organizational process assets update" Note from the Author or Editor: |
Luc Hamers | Feb 02, 2014 | Jul 14, 2014 |
Printed, PDF | Page 161 Answer to question 17 |
The answer to question 17 has got nothing to do with the question, it explains a completely different item. The question is about the project charter, the answer is about the project management system. In my opinion, the answer B is correct a stated, just the explanation is about something else. Note from the Author or Editor: |
Luc Hamers | Feb 16, 2014 | Jul 14, 2014 |
Printed | Page 175 Note Paragraph for Requirements Management Plan |
last three words of note are "throughout he project." should be "throughout the project." Note from the Author or Editor: |
Amanda O'Connor | Jul 14, 2014 | Feb 19, 2016 |
Printed | Page 186 Answers of the exercise |
Nominal troup technique should be nominal group technique Note from the Author or Editor: |
Luc Hamers | Feb 03, 2014 | Jul 14, 2014 |
Printed | Page 190 Bottom right |
Project document update should be Project documents update. Note from the Author or Editor: |
Luc Hamers | Feb 03, 2014 | Jul 14, 2014 |
Printed | Page 215 Bottom, second icon from the right |
Project document updates should be Project documents updates Note from the Author or Editor: |
Luc Hamers | Feb 04, 2014 | Jul 14, 2014 |
Printed | Page 221 middle of the page |
In the Printed version of Head First PMP 3rd edition the control scope process magnet exercise indicates that one of the magnets is: "Now the team can change the way they do the work" and the answer page on 222 has the same magnet but with a minor language change of: "How the team can change the way they do the work" This is confusing since you are now doing the work, not how. Note from the Author or Editor: |
john cellucci | Sep 26, 2014 | Feb 19, 2016 |
Page 223 Canada |
One of the outputs of the Validate Scope process is "Accepted Deliverables" not "Verified Deliverables". Note from the Author or Editor: |
Ashish Potla | May 25, 2015 | Feb 19, 2016 | |
Printed | Page 236 2. Answer: A |
The last sentence states that "the business case was created by the Develop Project Charter, which is part of the Initiating process group". This tells readers that the business case is an output, which is incorrect. Note from the Author or Editor: |
Albert L | Aug 21, 2017 | |
Printed | Page 238 10. Answer: B |
The explanation of the error states, "When you're getting the sponsor and stakeholders to formally accept the results of the project, you're doing Validate Scope. There's only one tool for it: inspection." This is incorrect, as there is one other tool: group decision-making techniques (see also p. 223). Note from the Author or Editor: |
Albert L | Aug 21, 2017 | |
Printed | Page 241 Middle of the page |
The explanation says the "three outputs of Collect Requirements are requirements documentation and the requirements traceability matrix." These are just two outputs, not three. Requirements Observations is obviously wrong but Answer C, "Requirements Management Plan" is also not an output of "Collect Requirements" - it is an output of "Plan Scope Management". Note from the Author or Editor: |
marcosal | Sep 27, 2016 | Aug 18, 2017 |
Printed | Page 267 Center |
Project document updates should be Project documents updates Note from the Author or Editor: |
Luc Hamers | Feb 11, 2014 | Jul 14, 2014 |
Printed | Page 272 Bottom left |
Project document updates should be Project documents updates Note from the Author or Editor: |
Luc Hamers | Feb 11, 2014 | Jul 14, 2014 |
Printed, PDF | Page 286 Item 3, first and last line with arrows |
In the first line with arrows, the texts Activity A and Activity B is missing. Note from the Author or Editor: |
Luc Hamers | Feb 12, 2014 | Jul 14, 2014 |
Printed, PDF | Page 291 Bottom left |
The bullet lines for the floats are not aligned with the characters A-I Note from the Author or Editor: |
Luc Hamers | Feb 13, 2014 | Jul 14, 2014 |
Printed | Page 304 First Paragraph |
"problems" misspelled as "problens" Note from the Author or Editor: |
Ali Albahrani | Jan 21, 2018 | |
Printed | Page 313 Bottom centre floating text blurb |
"come up with better understand" should read "come up with better understanding" Note from the Author or Editor: |
GregEva | Jul 10, 2015 | Feb 19, 2016 |
Printed, PDF | Page 317 Bottom right |
The answers are on page 324, not on 318 Note from the Author or Editor: |
Luc Hamers | Feb 13, 2014 | Jul 14, 2014 |
Printed | Page 317 Bottom left; number 14 |
Definition of the PERT three-point estimation method should include "divided by 6" at the end. Note from the Author or Editor: |
GregEva | Jul 10, 2015 | Feb 19, 2016 |
Printed | Page 321 Problem 7 |
Answer for p 319 q 7 part D is 0, D is on the critical path. The answer key on page 321 is gravely incorrect. Note from the Author or Editor: |
KEN | Jul 25, 2016 | Aug 18, 2017 |
Printed | Page 321 Middle |
How can “0” be the correct answer for C? C is not a part of the critical path. It is on the last path which is 17-10, making C technically 7 (although that seems odd with A and B being 2). Note from the Author or Editor: |
Nicole | Oct 23, 2017 | |
Printed | Page 321 Exercise solution on the upper part |
Answer for page 291 question 7 part C is 7, it is not 0. Note from the Author or Editor: |
Giuseppe Giuffrida | Feb 10, 2018 | |
Printed | Page 324 Left middle, under sneakers |
Reads "Exercise" should read "Exercise Solution" Note from the Author or Editor: |
GregEva | Jul 10, 2015 | Feb 19, 2016 |
Printed | Page 355 Far left column, around the middle |
quote referencing PMBOK Guide has an unneeded space between the double quotes and the a, meaing that it is using closing quotes instead of openning quotes. Note from the Author or Editor: |
Greg EVA | Jul 20, 2015 | Feb 19, 2016 |
Printed | Page 361 Entrie section |
For "control cost" process, the book is missing mention of outputs. It only touches on inputs and tools. Note from the Author or Editor: |
Ali Albahrani | Jan 21, 2018 | |
Printed, PDF | Page 369 Every fill-in field in the sharpen your pencil section |
The dotted lines are not where they are supposed to be, they all are too far to the right. Note from the Author or Editor: |
Luc Hamers | Feb 18, 2014 | Jul 14, 2014 |
Printed | Page 369 Upper right |
Page reference 354 should read 364. Note from the Author or Editor: |
Greg EVA | Jul 20, 2015 | Feb 19, 2016 |
Printed, PDF | Page 371 Items 2, 3 and 4 |
The underlines and the positions of the numbers to be filled in don't match Note from the Author or Editor: |
Luc Hamers | Feb 18, 2014 | Jul 14, 2014 |
Printed, PDF | Page 380 Top left |
The text is slightly behind the exercise-shoes-symbol Note from the Author or Editor: |
Luc Hamers | Feb 19, 2014 | Jul 14, 2014 |
Printed, PDF | Page 385 Bottom right |
The TCPI is not rounded correctly, the answer should be 0.87 instead of 0.86. Note from the Author or Editor: |
Luc Hamers | Mar 09, 2014 | Jul 14, 2014 |
Printed | Page 385 Middle middle |
Reads "exactly where needed to keep her CPI" should read "exactly where she needed to keep her CPI" Note from the Author or Editor: |
Greg EVA | Jul 20, 2015 | Feb 19, 2016 |
Printed, PDF | Page 386 Bottom right |
The answers are on page 394, not 384 Note from the Author or Editor: |
Luc Hamers | Feb 19, 2014 | Jul 14, 2014 |
Printed | Page 386 Right side, bottom |
page reference 384 should read 394. Note from the Author or Editor: |
Greg EVA | Jul 20, 2015 | Feb 19, 2016 |
Page 395 second question hint text |
The hint text of the second question reads- "Some of the earned value numbers have alternate four-letter abbreviations. This one stands for ?budgeted cost of work performed.? Don?t worry you don?t need to memorize them! ". This instead should be "Some of the earned value numbers have alternate four-letter abbreviations. This one stands for ?budgeted cost of work scheduled. Don?t worry you don?t need to memorize them!" Note from the Author or Editor: |
Anonymous | May 05, 2014 | Jul 14, 2014 | |
Page 395 second question hint text |
The hint text of the second question reads- "Some of the earned value numbers have alternate four-letter abbreviations. This one stands for ?budgeted cost of work performed.? Don?t worry you don?t need to memorize them! ". This instead should be "Some of the earned value numbers have alternate four-letter abbreviations. This one stands for ?budgeted cost of work scheduled. Don?t worry you don?t need to memorize them!" Note from the Author or Editor: |
Anonymous | May 05, 2014 | Jul 14, 2014 | |
Printed | Page 400 1. answer, explanatory text |
The correct answer for this question is A ("Determine Budget") which is also listed as the correct answer. However, in the text below the very same "Determine Budget" is discarded because "it uses the cost baseline and thus the cost baseline has to be created before". This is wrong! The cost baseline is actually the output of the "Determine Budget" process (see PMBOK guide) and not its input. Instead the incorrect answer C ("Estimate Costs") is not mentioned at all - something got probably mixed up here… Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 401 Bottom left, TCPI formula |
Minus symbol used seems to have underline also on causing double dash instead of single dash Note from the Author or Editor: |
Greg EVA | Jul 20, 2015 | Feb 19, 2016 |
Printed, PDF | Page 402 Middle of the page |
You say, that in week 5 you should have completed 5/8 of 4km, which is 2500m. This is only correct when we are at the END of week 5 (the work of week 5 has been completed). At the beginning of week 5, we should have completed 2km. So IN week 5, our PV is between $104,000 and $130,000. Note from the Author or Editor: |
Luc Hamers | Apr 03, 2014 | Jul 14, 2014 |
Printed | Page 420 Remark on metric "Schedule variance" |
"Schedule variance" is part of the "Cost Management" knowledge area, not "Time Management". Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed, PDF | Page 435 3rd paragraph |
Project document updates should be Project documents updates Note from the Author or Editor: |
Luc Hamers | Feb 25, 2014 | Jul 14, 2014 |
Printed, PDF | Page 438 Bottom |
Project document updates should be Project documents updates Note from the Author or Editor: |
Luc Hamers | Feb 26, 2014 | Jul 14, 2014 |
Printed | Page 444 Top left corner |
Frame containing content is placed improperly on the page (its too high), making the Exercise image overlap with the page title/name. Note from the Author or Editor: |
Greg EVA | Aug 13, 2015 | Feb 19, 2016 |
Printed | Page 488 First tool/technique mentioned, but the error shows on *MANY* pages throughout the remaining book |
The book mentions six different conflict resolution techniques, one of them being "confronting" (with the remark that this actually means "problem solving"). Note from the Author or Editor: |
Anonymous | Nov 27, 2015 | Feb 19, 2016 |
Printed | Page 499 last paragraph |
Manage stakeholder expectations is a part of executing process group Note from the Author or Editor: |
Anonymous | Apr 03, 2013 | Dec 06, 2013 |
Printed, PDF | Page 519 Top right, above comm. management plan |
The comment says, that the comm. management plan is the only output of the plan communications management process, while the documents updates (on the same page) are also an output. Note from the Author or Editor: |
Luc Hamers | Mar 03, 2014 | Jul 14, 2014 |
Printed | Page 527 2nd paragraph, 1st sentence |
The text talks of "Direct and Manage Execution" - there is no such process! Either the "Direct and Manage Project Work" process is meant, or all processes in the overall "Executing Process Group". Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 528 1st paragraph, 1st sentence |
As this page is about the input of the process, the first sentence should probably read "Work performance data […]" (which is a valid input) instead of "Work performance information […]" (which is usually an output). Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 532 Clue for #10 across |
"Pull" is not a "communication model" but rather a "communication method" (see also page 517). Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 532 Clue for #11 down |
"Push" is not a "communication model" but rather a "communication method" (see also page 517). Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 554 Comment at the bottom on the input |
The icon and text for one input denote the "Project Charter" (which is in accordance with the PMBOK guide), but the comment below speaks of the "(project) scope statement". That is different document and not the correct one to be mentioned here! Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed | Page 566 "Brain power" question |
The question is: "Why do you think EEF are *not* an input to the Perform Qualitative Risk Analysis process?". Huh? They actually are! The EEFs are even shown by their typical symbol just two inches above! Either I don't understand the question correctly (maybe it should be rephrased then - what do the authors want me to ponder about?) or it simpley doesn't make sense. Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Page 576 United States |
In Step # 3, when you calculate the EMV, the Total should be + $30.70 instead of -$30.70. Note from the Author or Editor: |
Manish Agarwal | Jan 30, 2014 | Jul 14, 2014 | |
Page 607 United States |
The comments ""The key to this one is to remember that the Note from the Author or Editor: |
Manish Agarwal | Jan 30, 2014 | Jul 14, 2014 | |
Printed | Page 607 Question 7 |
The comment "Wow, did you see that huge red herring?" seems to refer to item 7, but obviously belongs to item 8 instead. There the question contains a long and totally useless text which is not necessary to answer the question itself… Note from the Author or Editor: |
Anonymous | Oct 29, 2015 | Feb 19, 2016 |
Printed, PDF | Page 632 Bottom right |
The answers are found on page 638, not on 630. Note from the Author or Editor: |
Luc Hamers | Mar 18, 2014 | Jul 14, 2014 |
Printed, PDF | Page 636 Top right, below item 3 |
The dotted line below item 3 should be a bit lower Note from the Author or Editor: |
Luc Hamers | Mar 18, 2014 | Jul 14, 2014 |
Printed | Page 647 14 Accross |
It says Invitation for _____ is a document. Note from the Author or Editor: |
Satya Swaroop P | Sep 25, 2016 | Aug 18, 2017 |
Printed | Page 657 Question 9, explanation |
The text explaining the answer is wrong or at least misleading: for the 25 month period, the 3rd year has already started! So the 10.000 $/year for maintenance would end up in 30.000 $ if those costs are paid yearly. Note from the Author or Editor: |
Anonymous | Nov 02, 2015 | Feb 19, 2016 |
Printed | Page 661 Upper left quarter |
"Nighife" probably should read "nightlife". Note from the Author or Editor: |
Anonymous | Nov 02, 2015 | Feb 19, 2016 |
Printed | Page 665 Comment on "Stakeholder Register" |
The sentence "The register should tell you what individual stakeholder, get out of [...]" doesn't make sense grammatically. Maybe the plural "stakeholders" (with "s" instead of the comma) was meant? Note from the Author or Editor: |
Anonymous | Nov 02, 2015 | Feb 19, 2016 |
Printed | Page 666 . |
You wrote "responsiblities" instead of "responsibilities". Note from the Author or Editor: |
Anonymous | Dec 07, 2015 | Feb 19, 2016 |
Printed | Page 669 United States |
Under the Plan Stakeholder Management process, the diagram on page 669 indicates that there are only two outputs and asks the reader to guess what one is. When you turn the page for the answers, the diagram now states that there is only one output of the Plan Stakeholder Management process. Note from the Author or Editor: |
Veronica Rahorn | May 25, 2014 | Jul 14, 2014 |
Printed, PDF | Page 673 Bottom of exersize |
The answers are on page 686 instead of page 676 Note from the Author or Editor: |
Luc Hamers | Mar 11, 2014 | Jul 14, 2014 |
Printed | Page 676 Bottom left |
"Organizational Irocess assets" should be "Organizational Process assets" Note from the Author or Editor: |
Ali Albahrani | Jan 24, 2018 | |
Printed | Page 678 Bottom left |
"Organizational Process assets" wording missing under related image Note from the Author or Editor: |
Ali Albahrani | Jan 24, 2018 | |
Printed | Page 691 Comment on answer to question 7 |
The chapter that should be referenced is chapter 3 ("The process framework"), not chapter 4 ("Project integration management"). Only the former one describes the Initiating process group which is mentioned here. Note from the Author or Editor: |
Anonymous | Nov 02, 2015 | Feb 19, 2016 |
Printed | Page 709 . |
A the Check your Knowledge on page 709, the whole Stakeholder knowledge area is omitted but is shown in the answers on page 727. Note from the Author or Editor: |
Anonymous | Mar 14, 2014 | Jul 14, 2014 |
Printed | Page 712 Left column with questions |
The distance between question 5 and the dotted line (where to enter the answer of question 4) is too low, the line almost overlays the question. Also the questions 6–10 seem shifted upwards (whereas the first few questions and the right column look okay), Note from the Author or Editor: |
Anonymous | Nov 03, 2015 | Feb 19, 2016 |
Printed | Page 719 Question 14 Answer |
Question 14 uses a TCPI formula of (EAC-EV)/(EAC-AC) for the calculation, but I've not seen this version of the formula anywhere else in all of my studying on this topic. Note from the Author or Editor: |
Anonymous | May 12, 2015 | Feb 19, 2016 |
Printed | Page 729 Answer to question 10 |
"Lgitimate" should read "Legitimate". Note from the Author or Editor: |
Anonymous | Nov 03, 2015 | Feb 19, 2016 |
Printed | Page 730 Answer to question 5 |
You're using a rounded value of 0.94 instead of the correct 0.9375 (= 15/16) for the intermediate result (CPI). But then, in the next step, you're using this rounded value (with only 2 significant digits!) to calculcate values with 6 significant digits? Note from the Author or Editor: |
Anonymous | Nov 03, 2015 | Feb 19, 2016 |
Printed, PDF | Page 733 Bottom |
The calculation of the pert answer is correct, 9 weeks, but this is answer B and not C! Note from the Author or Editor: |
Luc Hamers | Mar 27, 2014 | Jul 14, 2014 |
Printed | Page 734 Proposed solution for question 14 |
The whole text and calculation is full of errors (though the answer "B" is given correctly); Note from the Author or Editor: |
Anonymous | Nov 04, 2015 | Feb 19, 2016 |
Printed | Page 739 Answer to question 35 |
If asking for a thing like "teaming agreement", shouldn't that term be explained before? I can't remember reading about it in the book, and if were indeed mentioned there, it's at least not contained in the index… Note from the Author or Editor: |
Anonymous | Nov 04, 2015 | Feb 19, 2016 |
Printed | Page 755 Question 50 |
Practice question asks which of the following tools and techniques is the BEST one for you to consult and gives answer A, work performance data as the answer. However, work performance data is an input/output not a tool or technique. Note from the Author or Editor: |
Anonymous | Aug 10, 2017 | Aug 18, 2017 |
Printed | Page 765 Question 104 |
Several of the given figures do not fit together. For example: if BAC is $90,000 and EAC is $92,100, how can the difference VAC (VAC = BAC-EAC) be -$2,600? It should be -$2,100 then. Note from the Author or Editor: |
Anonymous | Nov 09, 2015 | Feb 19, 2016 |
Printed | Page 771 Question 137, possible answer D |
In the word "Manaement" a "g" is missing. |
Anonymous | Nov 09, 2015 | Feb 19, 2016 |
Printed | Page 803 Hint on answer to question 89 |
There is no such thing as "Administer Contracts". Probably this is an outdated PMP term from earlier versions of the PMBOK guide? The correct term probably should be "Control Procurements" for this process… Note from the Author or Editor: |
Anonymous | Nov 09, 2015 | Feb 19, 2016 |
Other Digital Version | 6009 Various throughout the book where it has the http://www.headfirstlabs.com/PMP link |
I am using Kindle reader. Note from the Author or Editor: |
Jeanne | Jul 11, 2014 | Jul 14, 2014 |