Version Location Description Submitted By Date submitted Date corrected
Printed
Page 57, 62
Figure 3-5, 3-14

During production the diagrams are often redrawn. In this case there were two changes that are inconsistent with the text discussion and other diagrams.

1 � Figure 3-5 depicts Switch 2 on top and Switch 3 on the bottom. These should be reversed.

2 � Figure 3-14 depicts BPDUs flowing to the root bridge which is just all kinds of wrong. The arrow between switch 2 and 3 should be going the other way.

Bruce Hartpence
Bruce Hartpence
 
Feb 01, 2012  Sep 28, 2012
Printed, PDF,
Page 57, 62
Spanning Tree chapter

The production mods causing the figures appearing in this chapter to disagree with the text have been addressed.

Bruce Hartpence
Bruce Hartpence
 
Apr 16, 2012  Sep 28, 2012